Article image
Article image
Article image
Article image

Tariki-2A well

The Tariki-2A sidetrack well reached a depth of 2398 metres by 6 a.m. yesterday, Petrocorp has advised. The well has been electrically logged and currently a 9% inch casing is being run in preparation for ; drilling ahead. '

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19870224.2.128.30

Bibliographic details

Press, 24 February 1987, Page 26

Word Count
39

Tariki-2A well Press, 24 February 1987, Page 26

Tariki-2A well Press, 24 February 1987, Page 26