Article image
Article image
Article image
Article image

Kumara-2

Petrocorp reported that at 6 a.m. yesterday efforts to retrieve the drill string at Kumara-2 well were unsuccessful and the well has been plugged back to 1571 m. The drill string is being inspected before drilling starts on a deviated hole from about 1600 m to a total depth of 1900 m.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19850803.2.127.20

Bibliographic details

Press, 3 August 1985, Page 24

Word Count
53

Kumara-2 Press, 3 August 1985, Page 24

Kumara-2 Press, 3 August 1985, Page 24