Article image
Article image
Article image
Article image

Buller power plan ‘dormant’

Wellington reporter Plans to develop the Buller River for hydro power are still dormant, according to the Electricity Division of the Ministry of Energy. The hydro-electricity potential of the Buller is rated at an annual 4000 gigawatt hours, about the same as the lower Waitaki River. A spokesman for the Electricity Division said that nothing new had been done on the Buller and there had been no suggestion of starting serious investigations, as had been claimed by the Environmental Defence Society.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19820107.2.91.2

Bibliographic details

Press, 7 January 1982, Page 15

Word Count
85

Buller power plan ‘dormant’ Press, 7 January 1982, Page 15

Buller power plan ‘dormant’ Press, 7 January 1982, Page 15