Article image
Article image
Article image
Article image
Article image
Article image

Tunnel ‘holed through’

SPA New Plymouth d The last of the tunnels ni connected with the Tongariro ; power development. the •J Waihohonu tunnel, part of iwthe Rangipo scheme, was ; 'holed through” on Friday. S It was still expected to be ji early 1983 before the dam g power house and the lining of : the 927 m tunnel are com-

pleted. but the whole Rangipo scheme was running to schedule, engineers said yesterday. For most of the men working on the tunnel, the job will be their last, as the Rangipo scheme - will complete the Tongariro power development and there are no more hydro schemes to which they can move.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19811123.2.76

Bibliographic details

Press, 23 November 1981, Page 13

Word Count
109

Tunnel ‘holed through’ Press, 23 November 1981, Page 13

Tunnel ‘holed through’ Press, 23 November 1981, Page 13