Article image
Article image
Article image
Article image

Crane-work talks start

PA Wellington Behind-scenes talks aimed to get work started again on building Wellington’s third port container crane are taking place. These result from an agreement reached last week between the Australian Steel Engineering Company Multicon, the Federation of Labour and the Wellington Boilermakers’ Society. The president of the F.O.L. (Mr W. J. Knox) said yesterday that he intended to discuss the agreement with the crane’s construction contractor, Downer and Company, as soon as possible.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19790509.2.27

Bibliographic details

Press, 9 May 1979, Page 3

Word Count
77

Crane-work talks start Press, 9 May 1979, Page 3

Crane-work talks start Press, 9 May 1979, Page 3