Article image
Article image
Article image
Article image
Article image
Article image

Repairs at Pukaki

The diversion culvert under the Pukaki high dam, which was damaged during heavy rain at Easter, may be back in use by May . 8. A 60-tonne energy dissipation block at the end of the culvert was uprooted by the force of water from Lake Pukaki passing through the culvert. Ministry of Works staff poured a new block which is now curing. Lake Pukaki has reached its highest level to date, 511.65 m above sea-level. Im higher than the previous maximum.

The lake has been allowed to rise steadily and no water ■ has been drawn off. However, the Electricity Department expects to have to draw off water to maintain lake levels further down the Waitaki River system.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19780417.2.46

Bibliographic details

Press, 17 April 1978, Page 6

Word Count
119

Repairs at Pukaki Press, 17 April 1978, Page 6

Repairs at Pukaki Press, 17 April 1978, Page 6