Article image
Article image
Article image
Article image

Slip work expensive

Work to prevent further slips on the Heathcote access road could cost the Christchurch-Lyttelton Road Tunnel Authority up to $15,000, the authority was told yesterday. A plan to ease the slope’s gradient and to keep it more stable will be presented to the Christchurch Drainage Board, and to the North Canterbury Catchment Board, before tenders can be called for the work proposed by Lovell, Smith and Associates. The tunnel authority will ask the boards about a possible subsidy for the project.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19751002.2.134

Bibliographic details

Press, Volume CXV, Issue 33963, 2 October 1975, Page 16

Word Count
84

Slip work expensive Press, Volume CXV, Issue 33963, 2 October 1975, Page 16

Slip work expensive Press, Volume CXV, Issue 33963, 2 October 1975, Page 16