Flounder 5 Well
Broken Hill Proprietary,) Ltd, advises that Hematite [j Petroleum Pty, Ltd, and Esso | '(Exploration and Production I Australia, Inc., report that i ■ the Flounder 5 well is drill- ' "ing ahead at 2469 metres •1(8102 feet); the lOf-in casing i (was set at 788 metres' 11 (2585 ft the well is programmed to a total depth of '2621 metres (8600 ft
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19750221.2.156
Bibliographic details
Press, Volume CXV, Issue 33774, 21 February 1975, Page 17
Word Count
63Flounder 5 Well Press, Volume CXV, Issue 33774, 21 February 1975, Page 17
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.