Article image
Article image
Article image
Article image

UPPER WAITAKI POWER DEVELOPMENT.—The final beams being placed on the new bridge which will Carry State Highway 8 over the Tekapo-to-Pukaki hydro-electricity canal 10 miles south of Tekapo. The bridge, 150ft long, is 45ft above the level of the existing highway. The Ministry of Works has to complete the decking and place guard-rails before the bridge is opened to traffic next month.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19710619.2.19

Bibliographic details

Press, Volume CXI, Issue 32637, 19 June 1971, Page 1

Word Count
62

UPPER WAITAKI POWER DEVELOPMENT.—The final beams being placed on the new bridge which will Carry State Highway 8 over the Tekapo-to-Pukaki hydro-electricity canal 10 miles south of Tekapo. The bridge, 150ft long, is 45ft above the level of the existing highway. The Ministry of Works has to complete the decking and place guard-rails before the bridge is opened to traffic next month. Press, Volume CXI, Issue 32637, 19 June 1971, Page 1

UPPER WAITAKI POWER DEVELOPMENT.—The final beams being placed on the new bridge which will Carry State Highway 8 over the Tekapo-to-Pukaki hydro-electricity canal 10 miles south of Tekapo. The bridge, 150ft long, is 45ft above the level of the existing highway. The Ministry of Works has to complete the decking and place guard-rails before the bridge is opened to traffic next month. Press, Volume CXI, Issue 32637, 19 June 1971, Page 1