Article image
Article image
Article image
Article image

Big Load In Tunnel

An articulated transporter carrying a 74-ton manufacturing press from Lyttelton to Christchurch took an hour to inch through the 12 mile Christchurch-Lyt-telton road tunnel early this morning. The load, at a height of 14ft s}in, barely cleared the roof of the tunnel and had to zig-zag to take advantage of varying heights in the tunnel, said the duty superviser for the Christ-church-Lyttelton Road Tunnel Authority (Mr A Gardner). The 60ft transporter was escorted by radio-equipped vehicles ahead and behind. Other vehicles using the tunnel were able to pass but care was needed.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19690619.2.100

Bibliographic details

Press, Volume CIX, Issue 32018, 19 June 1969, Page 18

Word Count
96

Big Load In Tunnel Press, Volume CIX, Issue 32018, 19 June 1969, Page 18

Big Load In Tunnel Press, Volume CIX, Issue 32018, 19 June 1969, Page 18