Article image
Article image
Article image
Article image

OVERBRIDGE UNDER CONSTRUCTION.—Work has started on the Adderley Terrace overbridge at Kaiapoi for the Northern Motorway, where it will cross the railway, road and diverted river. About 100 piles, each 30 feet long, will be driven by J. W. Williamson, Ltd, of Auckland, to support the piers.,

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19690430.2.87.2.1

Bibliographic details

Press, Volume CIX, Issue 31975, 30 April 1969, Page 12

Word Count
47

OVERBRIDGE UNDER CONSTRUCTION.—Work has started on the Adderley Terrace overbridge at Kaiapoi for the Northern Motorway, where it will cross the railway, road and diverted river. About 100 piles, each 30 feet long, will be driven by J. W. Williamson, Ltd, of Auckland, to support the piers., Press, Volume CIX, Issue 31975, 30 April 1969, Page 12

OVERBRIDGE UNDER CONSTRUCTION.—Work has started on the Adderley Terrace overbridge at Kaiapoi for the Northern Motorway, where it will cross the railway, road and diverted river. About 100 piles, each 30 feet long, will be driven by J. W. Williamson, Ltd, of Auckland, to support the piers., Press, Volume CIX, Issue 31975, 30 April 1969, Page 12