Article image
Article image
Article image
Article image

AN INTERIOR VIEW OF THE FORWARD SECTION of the National Airways Corporation’s first Boeing 737 showing insulation blankets being installed. This section, as well as the rear half, recently completed the 2800-mile rail journey from Boeing’s Wichita Division, where they are built, to the Seattle production lines where this photograph was taken. After the completion of preliminary interior work, the front and rear halves will be joined in the next major assembly step.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19680507.2.9

Bibliographic details

Press, Volume CVIII, Issue 31672, 7 May 1968, Page 1

Word Count
73

AN INTERIOR VIEW OF THE FORWARD SECTION of the National Airways Corporation’s first Boeing 737 showing insulation blankets being installed. This section, as well as the rear half, recently completed the 2800-mile rail journey from Boeing’s Wichita Division, where they are built, to the Seattle production lines where this photograph was taken. After the completion of preliminary interior work, the front and rear halves will be joined in the next major assembly step. Press, Volume CVIII, Issue 31672, 7 May 1968, Page 1

AN INTERIOR VIEW OF THE FORWARD SECTION of the National Airways Corporation’s first Boeing 737 showing insulation blankets being installed. This section, as well as the rear half, recently completed the 2800-mile rail journey from Boeing’s Wichita Division, where they are built, to the Seattle production lines where this photograph was taken. After the completion of preliminary interior work, the front and rear halves will be joined in the next major assembly step. Press, Volume CVIII, Issue 31672, 7 May 1968, Page 1