Warau Bridge

Sir,—The reply by the district highways engineer to H. M. Oatway’s letter regarding the delay in installing traffic lights at the Waiau Bridge says: “We have four quotes for the lights but there has been some difficulty with the design." Does this mean that quotes are given before the design of the lights is finalised? Is the delay in the design due to light designers being enticed away from the country by the brain drain? Can it be that the delay is caused by procrastination on! the part of bureaucrats? As the Ministry has failed to install the lights before Easter as promised, it is to be hoped that it will have officials at the bridge during peak hours to help eliminate the serious traffic jams which occur over every hbliday period.—Yours, etc., D. G. H. BUSH. Parnassus, April 10, 1968. (Mr D. B. Dallas, District Commissioner of Works, replies: “The comments on Mr Oatway’s letters should have read: ‘We have called for quotes for the lights. . . .’ Design was completed before these quotes were called. This department did make signalmen available to assist the | flow of traffic over the Easter

period, and we understand that there were no difficulties.”]

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19680420.2.85.11

Bibliographic details

Press, Volume CVIII, Issue 31659, 20 April 1968, Page 12

Word Count
201

Warau Bridge Press, Volume CVIII, Issue 31659, 20 April 1968, Page 12

Warau Bridge Press, Volume CVIII, Issue 31659, 20 April 1968, Page 12