Article image
Article image
Article image
Article image

MATERIAL AND SUPPLIES for West Arm being loaded on to barges for the 20-mile trip up Lake Manapouri for the hydro-electric power project. The barge can carry 100 tons and it takes a tug three hours to make the tow.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19670415.2.123

Bibliographic details

Press, Volume CVI, Issue 31345, 15 April 1967, Page 12

Word Count
40

MATERIAL AND SUPPLIES for West Arm being loaded on to barges for the 20-mile trip up Lake Manapouri for the hydro-electric power project. The barge can carry 100 tons and it takes a tug three hours to make the tow. Press, Volume CVI, Issue 31345, 15 April 1967, Page 12

MATERIAL AND SUPPLIES for West Arm being loaded on to barges for the 20-mile trip up Lake Manapouri for the hydro-electric power project. The barge can carry 100 tons and it takes a tug three hours to make the tow. Press, Volume CVI, Issue 31345, 15 April 1967, Page 12