GROWTH OF UNIVERSITY CONTINUES.—A new aerial view of the University of Canterbury at Ilam. The boiler-house, with the cap now in position on its tall chimney, is at bottom left. In the middle are the science buildings, with the new science library in front of the big physics-chemistry building, from which much scaffolding has now been removed. Additions on either side of the round theatre of the Engineering School on Creyke road can be seen at top left.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19660406.2.243
Bibliographic details
Press, Volume CV, Issue 31028, 6 April 1966, Page 22
Word Count
78GROWTH OF UNIVERSITY CONTINUES.—A new aerial view of the University of Canterbury at Ilam. The boiler-house, with the cap now in position on its tall chimney, is at bottom left. In the middle are the science buildings, with the new science library in front of the big physics-chemistry building, from which much scaffolding has now been removed. Additions on either side of the round theatre of the Engineering School on Creyke road can be seen at top left. Press, Volume CV, Issue 31028, 6 April 1966, Page 22
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.