WORK IN PROGRESS ON ADDITIONAL LECTURE ROOMS for the School of Engineering at Ham. The new rooms will adjoin the circular lecture theatre on the Creyke road frontage of the school.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19660302.2.164
Bibliographic details
Press, Volume CV, Issue 30998, 2 March 1966, Page 18
Word Count
31WORK IN PROGRESS ON ADDITIONAL LECTURE ROOMS for the School of Engineering at Ham. The new rooms will adjoin the circular lecture theatre on the Creyke road frontage of the school. Press, Volume CV, Issue 30998, 2 March 1966, Page 18
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.