PROGRESS WITH NEW HAAST PASS HIGHWAY.—TOP: Part of the new road near the Gates of Haast. Stewarts Knob (4490ft) is in the background. BOTTOM: The new highway being formed at Epitaph Cutting in the last six-and-a-half mile gap. The highway, linking Otago with the West Coast, will be open to traffic in November.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19650716.2.45
Bibliographic details
Press, Volume CIV, Issue 30804, 16 July 1965, Page 3
Word Count
53PROGRESS WITH NEW HAAST PASS HIGHWAY.—TOP: Part of the new road near the Gates of Haast. Stewarts Knob (4490ft) is in the background. BOTTOM: The new highway being formed at Epitaph Cutting in the last six-and-a-half mile gap. The highway, linking Otago with the West Coast, will be open to traffic in November. Press, Volume CIV, Issue 30804, 16 July 1965, Page 3
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.