Article image
Article image
Article image
Article image
Article image
Article image

PROGRESS WITH NEW HAAST PASS HIGHWAY.—TOP: Part of the new road near the Gates of Haast. Stewarts Knob (4490ft) is in the background. BOTTOM: The new highway being formed at Epitaph Cutting in the last six-and-a-half mile gap. The highway, linking Otago with the West Coast, will be open to traffic in November.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19650716.2.45

Bibliographic details

Press, Volume CIV, Issue 30804, 16 July 1965, Page 3

Word Count
53

PROGRESS WITH NEW HAAST PASS HIGHWAY.—TOP: Part of the new road near the Gates of Haast. Stewarts Knob (4490ft) is in the background. BOTTOM: The new highway being formed at Epitaph Cutting in the last six-and-a-half mile gap. The highway, linking Otago with the West Coast, will be open to traffic in November. Press, Volume CIV, Issue 30804, 16 July 1965, Page 3

PROGRESS WITH NEW HAAST PASS HIGHWAY.—TOP: Part of the new road near the Gates of Haast. Stewarts Knob (4490ft) is in the background. BOTTOM: The new highway being formed at Epitaph Cutting in the last six-and-a-half mile gap. The highway, linking Otago with the West Coast, will be open to traffic in November. Press, Volume CIV, Issue 30804, 16 July 1965, Page 3