Article image
Article image
Article image
Article image
Article image
Article image

AVON RIVER BANKS

Strengthening Needed

Some urgent repairs and strengthening work to training walls and river banks in the lower reaches of the Avon had been found necessary when Drainage Board and City Council engineers made an inspection recently, the works committee told the board last evening. It listed the repairs needed at the left bank upstream from the Pages road bridge, both banks downstream from the bridge, the right bank opposite the power-boat club, the right bank next to the main stormwater outfall from Bexley road and the left bank next to the bend in Kibblewhite street

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19640722.2.189

Bibliographic details

Press, Volume CIII, Issue 30499, 22 July 1964, Page 18

Word Count
98

AVON RIVER BANKS Press, Volume CIII, Issue 30499, 22 July 1964, Page 18

AVON RIVER BANKS Press, Volume CIII, Issue 30499, 22 July 1964, Page 18