Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

ABEL TASMAN PARK

Headquarters Planned

The Abel Tasman National Park Board has approved in principle the design of the park’s proposed new headquarters building at Totaranui, on the shore of Tasman Bay. The building will contain the ranger’s office, a public information space, and a hall to seat 100 persons which will house Maori artifacts and other historical material.

A hut has been erected in Anapai Bay in the park, with foot and boat access only. A new track has been built from Torrent Bay to the falls in Falls river, shortcircuiting a steep route over Bare Knob.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19640516.2.230

Bibliographic details

Press, Volume CIII, Issue 30442, 16 May 1964, Page 20

Word Count
98

ABEL TASMAN PARK Press, Volume CIII, Issue 30442, 16 May 1964, Page 20

ABEL TASMAN PARK Press, Volume CIII, Issue 30442, 16 May 1964, Page 20