Article image
Article image
Article image
Article image

THE NEWLY-OPENED WEST LONDON AIR TERMINAL in Cromwell road. It is designed to handle three times the number of 1,500,000 passengers who used the old temporary terminal every year, and it is capable of expansion. The temporary terminal, which had been used since 1957, will be demolished, and the site used to accommodate the new building’s coaches and cars.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19631112.2.134

Bibliographic details

Press, Volume CII, Issue 30286, 12 November 1963, Page 15

Word Count
59

THE NEWLY-OPENED WEST LONDON AIR TERMINAL in Cromwell road. It is designed to handle three times the number of 1,500,000 passengers who used the old temporary terminal every year, and it is capable of expansion. The temporary terminal, which had been used since 1957, will be demolished, and the site used to accommodate the new building’s coaches and cars. Press, Volume CII, Issue 30286, 12 November 1963, Page 15

THE NEWLY-OPENED WEST LONDON AIR TERMINAL in Cromwell road. It is designed to handle three times the number of 1,500,000 passengers who used the old temporary terminal every year, and it is capable of expansion. The temporary terminal, which had been used since 1957, will be demolished, and the site used to accommodate the new building’s coaches and cars. Press, Volume CII, Issue 30286, 12 November 1963, Page 15