Article image
Article image
Article image
Article image

PREPARATIONS FOR OPENING OF THE ROAD TUNNEL.—Preliminary work in the construction of the control and administration building for the Christchurch-Lyttelton Road Tunnel Authority. The building will overlook the toll plaza area and approach highway to the Heathcote portal.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19630912.2.85

Bibliographic details

Press, Volume CII, Issue 30234, 12 September 1963, Page 11

Word Count
38

PREPARATIONS FOR OPENING OF THE ROAD TUNNEL.—Preliminary work in the construction of the control and administration building for the Christchurch-Lyttelton Road Tunnel Authority. The building will overlook the toll plaza area and approach highway to the Heathcote portal. Press, Volume CII, Issue 30234, 12 September 1963, Page 11

PREPARATIONS FOR OPENING OF THE ROAD TUNNEL.—Preliminary work in the construction of the control and administration building for the Christchurch-Lyttelton Road Tunnel Authority. The building will overlook the toll plaza area and approach highway to the Heathcote portal. Press, Volume CII, Issue 30234, 12 September 1963, Page 11