New Footbridge
Work was expected to begin in the next six months on the replacement of the Madras street footbridge over the railway lines, said the New Zealand Railwav' district engineer <Mr G kShrimptonl. The new bridge 'would cover the same span as the present one. he said. u
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19620210.2.129
Bibliographic details
Press, Volume CI, Issue 29744, 10 February 1962, Page 12
Word Count
49New Footbridge Press, Volume CI, Issue 29744, 10 February 1962, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.