Article image
Article image
Article image
Article image

ROAD BLOCKED BY BUILDING

Bearing Breaks On Wheel (N.Z. Press Association) NEW PLYMOUTH. Dec. 20. Kapuni’s old railway sta-’ tion effectively blocked traffic for more than three hours just outside New Plymouth today. The station building was being transported along the highway when the bearings in the rear right wheel of the trailer broke as the narrow Te Henui river bridge was being negotiated. With about half the station across the bridge, and unable to go forward or back, the vehicle was stuck with the load jammed on either side of the 14ft bridge. It took more than two hours and a half before the correct spare parts could be found for the American-made vehicle. Then there was another half-hour's work by the driver. Mr P Thompson, of Wanganui, before the vehicle was able to move again. The breakdown occurred at 4.45 p.m. and it was not until 8.15 p.m. that the station was lumbering towards its destination again at a steady two to three miles an hour.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19611221.2.184

Bibliographic details

Press, Volume C, Issue 29702, 21 December 1961, Page 17

Word Count
168

ROAD BLOCKED BY BUILDING Press, Volume C, Issue 29702, 21 December 1961, Page 17

ROAD BLOCKED BY BUILDING Press, Volume C, Issue 29702, 21 December 1961, Page 17