Article image
Article image
Article image
Article image

A NEW APPROACH TO ST. PAUL’S.— A drawing of Crest House, the four interlinked office blocks which are being built near St. Paul’s Cathedral, London. It is expected that the buildings will be completed towards the end of 1963 at a cost of £1,250.000. There will be accommodation for offices, shops, a targe restaurant, parking, and a museum underground for the nearby College of Arms. The block nearest to the Cathedral will be a seven-storeyed structure faced in granite and black slate.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19611127.2.30

Bibliographic details

Press, Volume C, Issue 29681, 27 November 1961, Page 5

Word Count
82

A NEW APPROACH TO ST. PAUL’S.—A drawing of Crest House, the four interlinked office blocks which are being built near St. Paul’s Cathedral, London. It is expected that the buildings will be completed towards the end of 1963 at a cost of £1,250.000. There will be accommodation for offices, shops, a targe restaurant, parking, and a museum underground for the nearby College of Arms. The block nearest to the Cathedral will be a seven-storeyed structure faced in granite and black slate. Press, Volume C, Issue 29681, 27 November 1961, Page 5

A NEW APPROACH TO ST. PAUL’S.—A drawing of Crest House, the four interlinked office blocks which are being built near St. Paul’s Cathedral, London. It is expected that the buildings will be completed towards the end of 1963 at a cost of £1,250.000. There will be accommodation for offices, shops, a targe restaurant, parking, and a museum underground for the nearby College of Arms. The block nearest to the Cathedral will be a seven-storeyed structure faced in granite and black slate. Press, Volume C, Issue 29681, 27 November 1961, Page 5