Article image
Article image
Article image
Article image

A NEW RAILWAY SIGNAL CONTROL BOX being installed near the Colombo street overhead bridge yesterday. The box, which weighs two tons and a half, is being lowered by a crane into the signals hut through a hole in the roof.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19600617.2.164

Bibliographic details

Press, Volume XCIX, Issue 29233, 17 June 1960, Page 15

Word Count
40

A NEW RAILWAY SIGNAL CONTROL BOX being installed near the Colombo street overhead bridge yesterday. The box, which weighs two tons and a half, is being lowered by a crane into the signals hut through a hole in the roof. Press, Volume XCIX, Issue 29233, 17 June 1960, Page 15

A NEW RAILWAY SIGNAL CONTROL BOX being installed near the Colombo street overhead bridge yesterday. The box, which weighs two tons and a half, is being lowered by a crane into the signals hut through a hole in the roof. Press, Volume XCIX, Issue 29233, 17 June 1960, Page 15