A NEW RAILWAY SIGNAL CONTROL BOX being installed near the Colombo street overhead bridge yesterday. The box, which weighs two tons and a half, is being lowered by a crane into the signals hut through a hole in the roof.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19600617.2.164
Bibliographic details
Press, Volume XCIX, Issue 29233, 17 June 1960, Page 15
Word Count
40A NEW RAILWAY SIGNAL CONTROL BOX being installed near the Colombo street overhead bridge yesterday. The box, which weighs two tons and a half, is being lowered by a crane into the signals hut through a hole in the roof. Press, Volume XCIX, Issue 29233, 17 June 1960, Page 15
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.