Article image
Article image
Article image
Article image

£10m Drainage Scheme

Auckland has now spent almost £6 million on the new Manukau drainage scheme. Figures released by the Auckland Metropolitan Drainage Board last night show that up to April 20 it had raised £5,966,040 in loans and spent all but £9727. The cost of the first stage of the scheme, the most modern of its type in the world, is £10.4 million. The board has planned an expenditure this year of £3.5 million on the Manukau project and the existing system. If loan money can be raised the first stage should be in service by November next year.—(P.A.)

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19590507.2.62

Bibliographic details

Press, Volume XCVIII, Issue 28888, 7 May 1959, Page 7

Word Count
100

£10m Drainage Scheme Press, Volume XCVIII, Issue 28888, 7 May 1959, Page 7

£10m Drainage Scheme Press, Volume XCVIII, Issue 28888, 7 May 1959, Page 7