Article image
Article image
Article image
Article image

NEW SWIMMING POOL FOR TIMARU.—This model of the new swimming pool to be built at Caroline Bay, Timaru, to mark the centenary of South Canterbury next year, was shown to.delegates at the New Zealand Amateur Swimming Association’s annual conference in Christchurch yesterday. The pool is estimated to cost about £66,000, and it will incorporate every modern development. Mr J. R. Fraser, president of the South Canterbury Swimming Centre (left), and the architect, Mr P. J. Beaven, are shown examining the model.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19581028.2.195

Bibliographic details

Press, Volume XCVII, Issue 28728, 28 October 1958, Page 18

Word Count
81

NEW SWIMMING POOL FOR TIMARU.—This model of the new swimming pool to be built at Caroline Bay, Timaru, to mark the centenary of South Canterbury next year, was shown to.delegates at the New Zealand Amateur Swimming Association’s annual conference in Christchurch yesterday. The pool is estimated to cost about £66,000, and it will incorporate every modern development. Mr J. R. Fraser, president of the South Canterbury Swimming Centre (left), and the architect, Mr P. J. Beaven, are shown examining the model. Press, Volume XCVII, Issue 28728, 28 October 1958, Page 18

NEW SWIMMING POOL FOR TIMARU.—This model of the new swimming pool to be built at Caroline Bay, Timaru, to mark the centenary of South Canterbury next year, was shown to.delegates at the New Zealand Amateur Swimming Association’s annual conference in Christchurch yesterday. The pool is estimated to cost about £66,000, and it will incorporate every modern development. Mr J. R. Fraser, president of the South Canterbury Swimming Centre (left), and the architect, Mr P. J. Beaven, are shown examining the model. Press, Volume XCVII, Issue 28728, 28 October 1958, Page 18