NEW SWIMMING POOL FOR TIMARU.—This model of the new swimming pool to be built at Caroline Bay, Timaru, to mark the centenary of South Canterbury next year, was shown to.delegates at the New Zealand Amateur Swimming Association’s annual conference in Christchurch yesterday. The pool is estimated to cost about £66,000, and it will incorporate every modern development. Mr J. R. Fraser, president of the South Canterbury Swimming Centre (left), and the architect, Mr P. J. Beaven, are shown examining the model.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19581028.2.195
Bibliographic details
Press, Volume XCVII, Issue 28728, 28 October 1958, Page 18
Word Count
81NEW SWIMMING POOL FOR TIMARU.—This model of the new swimming pool to be built at Caroline Bay, Timaru, to mark the centenary of South Canterbury next year, was shown to.delegates at the New Zealand Amateur Swimming Association’s annual conference in Christchurch yesterday. The pool is estimated to cost about £66,000, and it will incorporate every modern development. Mr J. R. Fraser, president of the South Canterbury Swimming Centre (left), and the architect, Mr P. J. Beaven, are shown examining the model. Press, Volume XCVII, Issue 28728, 28 October 1958, Page 18
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.