Article image
Article image
Article image
Article image

SAILING SHIP LAUNCHED AT HAMBURG—The West German Navy’s new three-masted training ship, Gorch Feck, enters the water at the Blohm and Voss shipyard in Hamburg on August 23. The barque, similar to the .ill-fated Pamir, contains heavy lead blocks to keep it on even keel in heavy seas. It will put to sea later this year with 11 officers, 56 sailors and 200 cadets aboard.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19580901.2.185

Bibliographic details

Press, Volume XCVII, Issue 28679, 1 September 1958, Page 14

Word Count
65

SAILING SHIP LAUNCHED AT HAMBURG—The West German Navy’s new three-masted training ship, Gorch Feck, enters the water at the Blohm and Voss shipyard in Hamburg on August 23. The barque, similar to the .ill-fated Pamir, contains heavy lead blocks to keep it on even keel in heavy seas. It will put to sea later this year with 11 officers, 56 sailors and 200 cadets aboard. Press, Volume XCVII, Issue 28679, 1 September 1958, Page 14

SAILING SHIP LAUNCHED AT HAMBURG—The West German Navy’s new three-masted training ship, Gorch Feck, enters the water at the Blohm and Voss shipyard in Hamburg on August 23. The barque, similar to the .ill-fated Pamir, contains heavy lead blocks to keep it on even keel in heavy seas. It will put to sea later this year with 11 officers, 56 sailors and 200 cadets aboard. Press, Volume XCVII, Issue 28679, 1 September 1958, Page 14