Article image
Article image

A flash-over on a temporary substation structure at the Cobb hydroelectric generating station at 6.10 p.m. on Wednesday blacked out the Nelson and Marlborough districts for two hours. State Hydro-electric Department staff at Cobb river worked out of doors in steady rain by the light of truck headlamps and torches to replace burnt lines and fit new connexions. The flash-over, which caused a violent surge over the whole supply system, might have been caused by lightning, the department’s district engineer. Mr ... S. S. Meredith, said yesterday. No major item of plant was d-wnged. he said.—<FOOß)

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19550603.2.135

Bibliographic details

Press, Volume XCI, Issue 27675, 3 June 1955, Page 14

Word Count
95

Untitled Press, Volume XCI, Issue 27675, 3 June 1955, Page 14

Untitled Press, Volume XCI, Issue 27675, 3 June 1955, Page 14