Article image
Article image
Article image
Article image

NEW SCHOOL BUILDING AT KAIKOURA.—Extensive additions which are being made to the Kaikoura District High School. The block will provide two new classrooms, the headmaster’s office, a staff room, a clerical assistants’ room, and cloakrooms with a concrete assembly area in front. It is expected that the building, which is of veneer brick, will be ready for occupation at the beginning of next year.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19540928.2.135

Bibliographic details

Press, Volume XC, Issue 27466, 28 September 1954, Page 14

Word Count
64

NEW SCHOOL BUILDING AT KAIKOURA.—Extensive additions which are being made to the Kaikoura District High School. The block will provide two new classrooms, the headmaster’s office, a staff room, a clerical assistants’ room, and cloakrooms with a concrete assembly area in front. It is expected that the building, which is of veneer brick, will be ready for occupation at the beginning of next year. Press, Volume XC, Issue 27466, 28 September 1954, Page 14

NEW SCHOOL BUILDING AT KAIKOURA.—Extensive additions which are being made to the Kaikoura District High School. The block will provide two new classrooms, the headmaster’s office, a staff room, a clerical assistants’ room, and cloakrooms with a concrete assembly area in front. It is expected that the building, which is of veneer brick, will be ready for occupation at the beginning of next year. Press, Volume XC, Issue 27466, 28 September 1954, Page 14