NEW SCHOOL BUILDING AT KAIKOURA.—Extensive additions which are being made to the Kaikoura District High School. The block will provide two new classrooms, the headmaster’s office, a staff room, a clerical assistants’ room, and cloakrooms with a concrete assembly area in front. It is expected that the building, which is of veneer brick, will be ready for occupation at the beginning of next year.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19540928.2.135
Bibliographic details
Press, Volume XC, Issue 27466, 28 September 1954, Page 14
Word Count
64NEW SCHOOL BUILDING AT KAIKOURA.—Extensive additions which are being made to the Kaikoura District High School. The block will provide two new classrooms, the headmaster’s office, a staff room, a clerical assistants’ room, and cloakrooms with a concrete assembly area in front. It is expected that the building, which is of veneer brick, will be ready for occupation at the beginning of next year. Press, Volume XC, Issue 27466, 28 September 1954, Page 14
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.