Article image
Article image

New Main Pumping Station.—The erection of the whole building of the new main pumping station at Sandilands was authorised by the Christ: church Drainage Board last evening. The building has a length of about two chains.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19530722.2.67

Bibliographic details

Press, Volume LXXXIX, Issue 27098, 22 July 1953, Page 8

Word Count
36

Untitled Press, Volume LXXXIX, Issue 27098, 22 July 1953, Page 8

Untitled Press, Volume LXXXIX, Issue 27098, 22 July 1953, Page 8