Article image
Article image
Article image
Article image

IMPROVEMENTS AT HANMER

* WATER SUPPLY AND TARSEALING OF STREETS Improvements to the Hanmer water supply system by the Public Works Department are well forward. Hanmer is also likely to be provided with tar-sealed streets within a short time, as specifications for this work, for which a sum was placed on the Estimates, have been submitted by the Amuri County Council for approval. The new intake for the water supply and the hydro-electric works has been completed. Filter tanks are being built on Conical Hill, and when these are completed the town should be provided with a good water supply at all times. At present, whenever there is a fresh in the Rogerson river, the water supply becomes full of particles. Extensions of water mains to the sub-division up Jack's road are in hand.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19380121.2.107

Bibliographic details

Press, Volume LXXIV, Issue 22306, 21 January 1938, Page 12

Word Count
133

IMPROVEMENTS AT HANMER Press, Volume LXXIV, Issue 22306, 21 January 1938, Page 12

IMPROVEMENTS AT HANMER Press, Volume LXXIV, Issue 22306, 21 January 1938, Page 12