Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

SINGAPORE BASE NOW COMPLETE

ADMIRALTY TAKES OVER

(Received March 8, 8.3 p.m.)

SINGAPORE, March 7

An official message states that the contractors have completed the main works on the Singapore Base, which has been taken over by Admiralty engineers to carry out subsidiary works. The base is now authoritatively regarded as an effective unit in Imperial defence in the Pacific.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19360309.2.73

Bibliographic details

Press, Volume LXXII, Issue 21727, 9 March 1936, Page 11

Word Count
60

SINGAPORE BASE NOW COMPLETE Press, Volume LXXII, Issue 21727, 9 March 1936, Page 11

SINGAPORE BASE NOW COMPLETE Press, Volume LXXII, Issue 21727, 9 March 1936, Page 11