Article image
Article image
Article image
Article image

APARIMA BRIDGE.

OFFICIAL OPENING. (FBCSS ASSOCIATION TELXQRAH.) INVERCARGILL, November 12. Commenced about two years ago by the Public Works Department, the new traffic bridge over the Aparima river at Riverton was officially opened this afternoon by Mr Adam Hamilton. M.P. The bridge is a concrete structure 440 feet in length, composed of eleven 40-feet spans, and has a footpath four feet in width. The estimated cost is £27,300, including roadWays of 18 feet, and it is expected that it will be completed under estimated cost. Two-thirds of this cost is l>orn« by the Main Highways Board and the remainder by the local bodies concerned.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19301113.2.121

Bibliographic details

Press, Volume LXVI, Issue 20084, 13 November 1930, Page 16

Word Count
104

APARIMA BRIDGE. Press, Volume LXVI, Issue 20084, 13 November 1930, Page 16

APARIMA BRIDGE. Press, Volume LXVI, Issue 20084, 13 November 1930, Page 16