Article image
Article image
Article image
Article image

OTAGO CENTRAL RAILWAY.

TRAFFIC STILL CLOCKED. (SPECIAL TO "THE Pn_J3.") DUXEDIN, September 2. There is no prospect of traffic being resumed on the Dunodin section of tho Otago Central Railway for a week, or possibly longer. Workmen are busy removing tho earth brought down by the slips. At Barewcod creek the bank haa fallen into the river, and men were to be sent to that spot this morning in order to make a temporary bridge. In the meantime mails and passengers are being brought from Clyde to Ranfurly by rail, thence to Palmerston South by motor car.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19130903.2.24

Bibliographic details

Press, Volume XLIX, Issue 14761, 3 September 1913, Page 6

Word Count
97

OTAGO CENTRAL RAILWAY. Press, Volume XLIX, Issue 14761, 3 September 1913, Page 6

OTAGO CENTRAL RAILWAY. Press, Volume XLIX, Issue 14761, 3 September 1913, Page 6