Article image
Article image
Article image
Article image

WITHIN NINE DAYS-OF THE SITE BEING CLEARED the first completed house built by American soldiers appeared in a bombed area at Brixton, London. The house has curved asbestos roof and dwarf brick walls standing on a concrete base. These temporary houses are being rushed up to house people left homeless after V bomb attacks.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19450214.2.31.1

Bibliographic details

Auckland Star, Volume LXXVI, Issue 38, 14 February 1945, Page 4

Word Count
54

WITHIN NINE DAYS-OF THE SITE BEING CLEARED the first completed house built by American soldiers appeared in a bombed area at Brixton, London. The house has curved asbestos roof and dwarf brick walls standing on a concrete base. These temporary houses are being rushed up to house people left homeless after V bomb attacks. Auckland Star, Volume LXXVI, Issue 38, 14 February 1945, Page 4

WITHIN NINE DAYS-OF THE SITE BEING CLEARED the first completed house built by American soldiers appeared in a bombed area at Brixton, London. The house has curved asbestos roof and dwarf brick walls standing on a concrete base. These temporary houses are being rushed up to house people left homeless after V bomb attacks. Auckland Star, Volume LXXVI, Issue 38, 14 February 1945, Page 4