Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

RAILWAY SURVEY.

TANEATUA-OPOTiKI LINK.

EARLY START AXXOrXCED

The Public Works Department lias had definite instructions to proceed with an up-to-date survey of the proposed railway route between Taneatua and Opotiki and a start on the survey work will be made at an earlv date."

This information was conveyed in a letter received at to-day's meeting of the council of the Auckland Chamber of Commerce from Mr. S. Baker, actin" Engineer-in-Chief and Under-Secretary of the Public Works Department. The letter was in reply to correspondence initiated by the chamber pressing for tho closing of the present rail gap.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19380602.2.86

Bibliographic details

Auckland Star, Volume LXIX, Issue 128, 2 June 1938, Page 8

Word Count
97

RAILWAY SURVEY. Auckland Star, Volume LXIX, Issue 128, 2 June 1938, Page 8

RAILWAY SURVEY. Auckland Star, Volume LXIX, Issue 128, 2 June 1938, Page 8