Article image
Article image
Article image
Article image

BIG PROJECT.

TUNNEL UNDER RIVER. Costly Plan to Relieve London Traffic. OVER £3,000,000 SCHEME. British Official Wireless. (Received 0.30 a.m.) RUGBY, August 16. Construction of the Dartford-Purfleet tunnel to provide a link between the north and south sides of the Thames Estuary is to be begun within the next few weeks. The cost of the whole system is estimated at about £3,200,000. As a first step it is proposed to construct a pilot tunnel' abput 900 yds long with an internal diameter of 12ft, also shield chambers and certain other 1 ancillary works in connection with the main tunnel, vThe pilot tunnel and the ancillary work will cost about £300,000. It will provide information as to. the ! strata under the river at 'this point, | as well as on other matters which will | be helpful ill connection with the coni struction of the main tunnel which will be rather more than a mile in length. | At present there is no facility for ! crossing the Thames by means of a . bridge or a tunnel below Blackwall tunnel, which is three miles from the | mouth of the estuary and 12 miles from j the site of the proposed tunnel.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19360817.2.55

Bibliographic details

Auckland Star, Volume LXVII, Issue 194, 17 August 1936, Page 7

Word Count
196

BIG PROJECT. Auckland Star, Volume LXVII, Issue 194, 17 August 1936, Page 7

BIG PROJECT. Auckland Star, Volume LXVII, Issue 194, 17 August 1936, Page 7