Article image
Article image
Article image
Article image

OVERHEAD CROSSINGS.

IMPROVEMENTS WHANKJAREI. (Ry Telegraph.—Own Correspondent.) WHAXGAREI, Friday. Two main girders of the railway embankment spanning Water Street, are being lifted into position to-day by the department's special crane. Two smaller footpath girders were lifted yesterday and two more on the north side ate ready for putting in .position. With the completion of this (.Tossing, speedy progress will be mnde with the embankment project, which will do away witli the level crossing menace in the business area of Whangarei. Walton Street was completed some weeks ago and concrete pillars are being erected in Rust Lane, which, when finished and spanned, will mark big headway in this undertaking. Meanwhile, the facing of the embankment is employing a body of men lifting huge girders into place. The work is attracting considerable public interest.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19261120.2.166

Bibliographic details

Auckland Star, Volume LVII, Issue 276, 20 November 1926, Page 18

Word Count
132

OVERHEAD CROSSINGS. Auckland Star, Volume LVII, Issue 276, 20 November 1926, Page 18

OVERHEAD CROSSINGS. Auckland Star, Volume LVII, Issue 276, 20 November 1926, Page 18