BARRIER REEFS.
The manager reports that the rain, coupled with the traffic, has made the road very heavy, and in places it is badly cut up. The work is proceeding as usual in the mine, timbering and stoping being done in Xo. 2 level. At the mill about the average rate of progress has been made. The boiler is in position and has been tested.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19000504.2.46.2
Bibliographic details
Auckland Star, Volume XXXI, Issue 105, 4 May 1900, Page 5
Word Count
65BARRIER REEFS. Auckland Star, Volume XXXI, Issue 105, 4 May 1900, Page 5
Using This Item
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.