Article image
Article image
Article image
Article image

BARRIER REEFS.

The manager reports that the rain, coupled with the traffic, has made the road very heavy, and in places it is badly cut up. The work is proceeding as usual in the mine, timbering and stoping being done in Xo. 2 level. At the mill about the average rate of progress has been made. The boiler is in position and has been tested.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19000504.2.46.2

Bibliographic details

Auckland Star, Volume XXXI, Issue 105, 4 May 1900, Page 5

Word Count
65

BARRIER REEFS. Auckland Star, Volume XXXI, Issue 105, 4 May 1900, Page 5

BARRIER REEFS. Auckland Star, Volume XXXI, Issue 105, 4 May 1900, Page 5