Article image
Article image
Article image
Article image
Article image
Article image

THE WAIHI RAILWAY.

Complaints having been made that work on Paeroa-Waihi railway was not being gone on with the engineer in charge was asked for a report. This has now been received. It is as

follows:—"Railway Waihi work started sixth March with thirty men in five parties beside eight others at casual work. Some £ 500 spent end last month.—Chas. R. Vickerman."

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19000407.2.8.7

Bibliographic details

Auckland Star, Volume XXXI, Issue 83, 7 April 1900, Page 3

Word Count
61

THE WAIHI RAILWAY. Auckland Star, Volume XXXI, Issue 83, 7 April 1900, Page 3

THE WAIHI RAILWAY. Auckland Star, Volume XXXI, Issue 83, 7 April 1900, Page 3