was built to the order of the Cambridge Borough Council by the American Biidge Co., of New York. The structure belongs to what is known es the three-hinged brcced arch type, and is the firsi of its [kind erected in New Zealand. It comprises one arch span of 290 ft. between skewbacks, two 65ft. plate girder flanking spans, and one 42ft. plate girder approach span. The total length is 462 ft. between abutments, with a clear height cf 126 ft. to han d railing above ordinary water level, while the width of deck is 17ft. between railings. The arch springs from pin connections on the concrete skewback piers 50ft. above water level of the river, with a rise of 52ft. to the crown pins at centre. The crown and skewback pins lie in an arch of 228 ft. radius. This arch extends the full width of the river, and erection was effected by " cantilevering " to av>id the necessity of staying and false work, and all possible inconvenience due to floods. A double cancellation system of laced angle bars extends between the up and down stream arches, or bottom chords, in twelve panels, or bays. During the process of *' cantilevering " the operation only differed from that in the construction of bridges of the cantilever design in that anchor I bars took the place of the anchor arm. The junction of the west aim, or half arch, was made after the erection of the steel end posts began, and in that time some SOO tons of steel were placed in position. The floor system is composed of an alternating arrangement of deep and shallow longitudinal I beam stringers, the deep beams spanning a panel

beams, or transoms, at every panel post, and is stiffened throughout by a simple arrangement of intersecting angle-bar wind-bracing in every panel. The spandrel members of the chords consist of vertical posts and diagonal

and the 65 ft. flank spans are carried on concrete abutments, which, during the erection of the arch, acted as anchors for the half arches or cantilever arms. The thrust of the ends of the arch is taken on skewback piers extending some 15ft. into the river banks, thus having a footing on a solid sandstone formation. To provide against corrosive deterioration of the steel composing the structure, the biidge has been painted throughout with a chemically combined " carbonising coating." The steel throughout is openhearth medium steel, including the rivets and bolts, and all the work in the American shops and material tests were conducted under the careful supervision of independent inspecting engineers. The bridge is designed not only to meet the requirements of to-day, but provision has been made fox the progress that comes with time ; and the possibility of electric or other tram cars has not been overlooked, for the structure is stiff enough to carry cars weighing 120,000 lbs., and having a length of 70 ft. Viewed from below, the span of the arch is more apparent than from the road level, and the contour is both imposing and graceful, though, cr mpared with the Victoria Falls bridge over the Zambesi, it is small. From an engineering point of view the fabric is an example of advanced bridge design and practice of to-day. Mr. J. E. Fulton, M.lnst.C.E., was the engineer, Mr. G. M. Fraser the contractor for the erection, and Mr. S. W. Jones resident assistant engineer. The structure is a landmark •for miles around the excellent agricultural districts it unites.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/periodicals/P19080201.2.17

Bibliographic details

Progress, Volume III, Issue 4, 1 February 1908, Page 119

Word Count
581

Untitled Progress, Volume III, Issue 4, 1 February 1908, Page 119

Untitled Progress, Volume III, Issue 4, 1 February 1908, Page 119