Article image
Article image
Article image
Article image

The load is levelled by hand over the pit, one man requiring only 4 minutes to do this if the load is partly levelled by having the wire mesh drawn over it before the apron is placed back on the floor of the trailer.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/periodicals/NZJAG19500715.2.12.4

Bibliographic details

New Zealand Journal of Agriculture, Volume 81, Issue 1, 15 July 1950, Page 17

Word Count
44

The load is levelled by hand over the pit, one man requiring only 4 minutes to do this if the load is partly levelled by having the wire mesh drawn over it before the apron is placed back on the floor of the trailer. New Zealand Journal of Agriculture, Volume 81, Issue 1, 15 July 1950, Page 17

The load is levelled by hand over the pit, one man requiring only 4 minutes to do this if the load is partly levelled by having the wire mesh drawn over it before the apron is placed back on the floor of the trailer. New Zealand Journal of Agriculture, Volume 81, Issue 1, 15 July 1950, Page 17