Article image
Article image
Article image
Article image

NORTHCOTE’S NEW WATER SUPPLY.

Nori heote- nim h needed water supply wa~ ollieially opened last week, when a number of prominent people were driven over to the Lake to witness the ceremony. I'oe pipe main eonsi-ts of approximately 10.001) feet of 8 inch east-iron pipes l - ilk " Uikapuna t’"‘ reservoir on Smale'- Ihll, 250 feet above sen level. with a capacity of 120.000 gallons. The pipe-, etc.. were supplied by Messrs. Briscoe. Limited, and the contractors for in-tailim- the -v-tem were Me,-r-. Rhodes and I Itek. I he motive power at the pumping station is suetion gas, the plant being supplied and installed by Messrs. J. .1. Niven and Co., of Napier. The total eo-t of the supply was about £10,500.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/periodicals/NZGRAP19080201.2.14

Bibliographic details

New Zealand Graphic, Volume XL, Issue 5, 1 February 1908, Page 7

Word Count
121

NORTHCOTE’S NEW WATER SUPPLY. New Zealand Graphic, Volume XL, Issue 5, 1 February 1908, Page 7

NORTHCOTE’S NEW WATER SUPPLY. New Zealand Graphic, Volume XL, Issue 5, 1 February 1908, Page 7