Article image
Article image
Article image
Article image

TAWA FLAT RAILWAY WORKS. —Construction work is proceeding rapidly in connection with the Tawa Flat railway deviation, the photograph showing the extent of the work after the line leaves the tunnel just past Johnsonville, running alongside the road. Further on the route will take the present road, which will be replaced by a new road a little lower down the hillside.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/WT19300522.2.12.5

Bibliographic details

Waikato Times, Volume 107, Issue 18026, 22 May 1930, Page 3

Word Count
61

TAWA FLAT RAILWAY WORKS.—Construction work is proceeding rapidly in connection with the Tawa Flat railway deviation, the photograph showing the extent of the work after the line leaves the tunnel just past Johnsonville, running alongside the road. Further on the route will take the present road, which will be replaced by a new road a little lower down the hillside. Waikato Times, Volume 107, Issue 18026, 22 May 1930, Page 3

TAWA FLAT RAILWAY WORKS.—Construction work is proceeding rapidly in connection with the Tawa Flat railway deviation, the photograph showing the extent of the work after the line leaves the tunnel just past Johnsonville, running alongside the road. Further on the route will take the present road, which will be replaced by a new road a little lower down the hillside. Waikato Times, Volume 107, Issue 18026, 22 May 1930, Page 3