Article image
Article image
Article image
Article image
Article image
Article image

THE GARDEN GULLY MINE.

(By Telegraph. — Special to Hkrald.) GREl r MOUTH, November 7.

The Garden Gully mine manager reports that the aerini line is now finished, and all the buckets are in position. A trial run haa not yet iaksn place as some clearing and "eicm'ations on the line havo to be made before the buckets can b* fillsd. This work will be don-, at once, and a trial run of the serial my be ex-]>-cfed before the.end of the weir. Work in the mina has 'been confined to No. 2 level, which has bran e-nlarged immediately above tho uprise so as to euable the quartz to be sent- down to No 3 level, from where it will be trucked out to tho slorage bins at the mine's mouth. As before stated, a successful trial run of the stampers ami uerdan took place last week.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/WH19051108.2.62

Bibliographic details

Wanganui Herald, Volume XXXIX, Issue 11709, 8 November 1905, Page 7

Word Count
146

THE GARDEN GULLY MINE. Wanganui Herald, Volume XXXIX, Issue 11709, 8 November 1905, Page 7

THE GARDEN GULLY MINE. Wanganui Herald, Volume XXXIX, Issue 11709, 8 November 1905, Page 7