Article image
Article image
Article image
Article image

South Spit Break Is Completely Sealed

“The South Spit break is completely blocked and raised above high-tide level right across the gap,” reported the supervisor (Mr. T. G. Mullins) at yesterday’s meeting of the Wanganui Flarbour Board. “Work is continuing in the capping and raising of this wall. “The threatened break behind the Mana has been ttniporari.y blocked, but this part will need constant attention until such time as a wal can be built with stone and concrete. A close watch is being !:c-pt on the travelling bays on the beach as these are the destrnc-Ive agents on the spit. To date the pi cs on the beach have he’d their own in retiming sand. “During the month 207 cubic- yards of shingle were placed m the South iSpir and 228 cubic yards of concrete were poured. At the north end of llv* I break the wall is joined up to the blocks. From the s,ui’w end the capping has been extmd.u’ to 690f1. and the beach has built Um to the top of this wal I .''

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/WC19480817.2.24

Bibliographic details

Wanganui Chronicle, 17 August 1948, Page 4

Word Count
177

South Spit Break Is Completely Sealed Wanganui Chronicle, 17 August 1948, Page 4

South Spit Break Is Completely Sealed Wanganui Chronicle, 17 August 1948, Page 4