BORING FOR OIL.
GISBORNE, Ju :n IM. Taranaki Oi Felds report lor th" week ended Juno 20:—“Waitangi No. 2 well: Further excellent drilling ; rogresF has been made, a depth of 1700 feet having been reached; hard grey shale with little lime; iH-inch casing has been mu to tho, full depth of the, well, ami the cementing of this easing is now taking place, in preparation for further drilling.”
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/WC19310626.2.81.8
Bibliographic details
Wanganui Chronicle, Volume 74, Issue 149, 26 June 1931, Page 9
Word Count
68BORING FOR OIL. Wanganui Chronicle, Volume 74, Issue 149, 26 June 1931, Page 9
Using This Item
NZME is the copyright owner for the Wanganui Chronicle. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.