Article image
Article image
Article image
Article image

FOR OTAGO HARBOUR

A NEW DREDGE ( Per Press Association. ] DUNEDIN, Feb. 15. At a special meeting of the Harbour Board to-night the question of procuring a new dredge for Otago harbour was discussed at length, and a repoit by the Board’s engineer, Mr Wilkie, was adopted. Mr Wilkie’s recommendations provide for a dredge not exceeding 65 feet in length, with a reasonable' width and of a draught of from 16 feet to 16 feet 6 inches, such dredge to have a hopper capacity of about 2000 tons and be self propelled. The' recommendations also provide for Mr Robertson, assistant engineer, to supervise the building of the dredge and to have the assistance' of a naval architect for hull and stability trials.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/WC19270216.2.56

Bibliographic details

Wanganui Chronicle, Volume LXXXIII, Issue 19768, 16 February 1927, Page 7

Word Count
121

FOR OTAGO HARBOUR Wanganui Chronicle, Volume LXXXIII, Issue 19768, 16 February 1927, Page 7

FOR OTAGO HARBOUR Wanganui Chronicle, Volume LXXXIII, Issue 19768, 16 February 1927, Page 7