Article image
Article image
Article image
Article image

MAIN HIGHWAYS.

BOARD’S WORK IN APRIL. The more important works carried out by the Alain Highways Board in the Wairarapa during April were:— , Wellington-Napier, via Wairarapa: The 45 chains gap north of the Silverstream railway bridge has been sealed with bitumen. Akatarawa Junction to Summit, Rimutaka: A substantial breakwind has been erected near tho summit. Rimutaka Summit to Featherston borough boundary: The widening of the formation to 24ft. is well advanced and a commencement has been wade with tho deviation between 8 miles 78 chains and 9 miles 7 chains. One mile of bituminous sealing has been completed. Falkner’s Bridge to Eketahuna deviation: 8 chains of form‘’4ft 1 * haS 136611 wiclened to a width of Masterton-Weber, via Alfredton: The erection of the new concrete bridge at 10-mile peg is well in hand. Fekthorston-Martinborough: A portion of this road near Featherston boundary has been finally surfaced with

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/WAG19280523.2.73

Bibliographic details

Wairarapa Age, 23 May 1928, Page 7

Word Count
146

MAIN HIGHWAYS. Wairarapa Age, 23 May 1928, Page 7

MAIN HIGHWAYS. Wairarapa Age, 23 May 1928, Page 7